Ottawa · demolition permit
D07-05-26-0003
Demolition Control
What this status means
Approved with conditions. Approved subject to conditions that must be satisfied before the permit takes effect.
Ottawa publishes this as “Receipt of Agreement from Owner Pending”, which it uses to mean: The City is waiting on the signed agreement from the owner.
Record as published
| Field | Value as published |
|---|---|
| File number | D07-05-26-0003 |
| Application type | Demolition Control |
| Category | Demolition Control |
| Description | Demolition Control |
| Status | Receipt of Agreement from Owner Pending |
| Applied | 2026-07-17 |
| Decision | not published |
| Decided by | not published |
| Decision date | not published |
| Issued / released | not published |
| Must commence by | not published |
| Cancelled / refused date | not published |
| Appeal number | not published |
| Appeal hearing | not published |
| Appeal decision | not published |
| Address | 166 HINCHEY |
| Community | not published |
| Ward | Ward 15 |
| Land use district | not published |
| District description | not published |
| Proposed district | not published |
| Cross-references | not published |
Blank rows mean the municipality does not publish that field for this record — not that the value is zero or unknown to the City.
Site locations
The City publishes 1 location on this file. A development site is frequently several titled parcels, and collapsing them to one address would lose the site.
| Address | Type | Coordinates |
|---|---|---|
| 166 HINCHEY | — | 45.40744, -75.73120 |
Established facts
3 facts derived from this record. Open any one to see the field, method, confidence and official record behind it.
| Fact | Value | Evidence | Confidence |
|---|---|---|---|
| Application type | Demolition Control | A · official field | 100% |
| Application type (French) | Réglementation des démolitions | A · official field | 100% |
| Status (French) | En Attente de la Réception de L'entente du Propriétaire | A · official field | 100% |
Application type: Demolition Control
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- APPLICATION_TYPE_EN
- Value as published
- Demolition Control
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Application type (French): Réglementation des démolitions
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- APPLICATION_TYPE_FR
- Value as published
- Réglementation des démolitions
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Status (French): En Attente de la Réception de L'entente du Propriétaire
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- OBJECT_CURRENT_STATUS_FR
- Value as published
- En Attente de la Réception de L'entente du Propriétaire
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Record history
First acquired 2026-09-02 and last confirmed still published on 2026-09-02. The municipality has not changed any tracked field on this file in that time — this platform compares content hashes on every poll, so an unchanged record produces no version and no event.
Questions about D07-05-26-0003
Answered from this filing's published fields. Every sentence describes the application, not a building.
- What is D07-05-26-0003?
- D07-05-26-0003 is a demolition permit filed with the City of Ottawa at 166 HINCHEY. The City describes it as: "Demolition Control". It is a municipal filing — a record of what was put to the City, not a record of what was built.
- Has D07-05-26-0003 been approved?
- The City of Ottawa publishes the status of D07-05-26-0003 as "Receipt of Agreement from Owner Pending". The City is waiting on the signed agreement from the owner. A filing's status describes the application, not construction: an approved application is not a building, and an issued permit is not proof that work began.
- When was D07-05-26-0003 applied for?
- D07-05-26-0003 carries an application date of 2026-07-17 on the City of Ottawa's published record. No decision date is published.
Attribution
Contains information licensed under the Open Government Licence – City of Ottawa. Read the licence
This platform is not affiliated with or endorsed by any municipality.
Official record
Open the municipality's dataset ↗
Development Applications publishes no permalink for an individual file, so this opens the dataset the record came from. Search it for D07-05-26-0003.
- Source
- Development Applications
- Licence
- Open Government Licence – City of Ottawa v2.0 (8 September 2016)
- Rights
- Licensed with conditions
- Documents
- Link and cite only
- Updated
- Not published by the City. Observed maximum APPLICATION_DATE of 2026-08-13 on 2026-08-30, so the layer is current to within about three weeks.
Supporting documents
None are hosted here, and this is a rights decision rather than a gap in the pipeline. Calgary’s open data publishes no document URLs at all; the drawings and studies live in the City’s own map viewer and are largely authored by the applicant, which places them outside the licence’s grant.
View at the City ↗Parties
No party is named on this record.