Ottawa · subdivision
D07-16-26-0012
Plan of Subdivision
What this status means
Public comment open. In its statutory notice or advertising period, when the public may comment.
Ottawa publishes this as “Comment Period in Progress”, which it uses to mean: The public comment period is open. This is the window in which a member of the public can respond.
Record as published
| Field | Value as published |
|---|---|
| File number | D07-16-26-0012 |
| Application type | Plan of Subdivision |
| Category | Plan of Subdivision |
| Description | Plan of Subdivision |
| Status | Comment Period in Progress |
| Applied | 2026-06-09 |
| Decision | not published |
| Decided by | not published |
| Decision date | not published |
| Issued / released | not published |
| Must commence by | not published |
| Cancelled / refused date | not published |
| Appeal number | not published |
| Appeal hearing | not published |
| Appeal decision | not published |
| Address | 4386 RIDEAU VALLEY |
| Community | not published |
| Ward | Ward 21 |
| Land use district | not published |
| District description | not published |
| Proposed district | not published |
| Cross-references | not published |
Blank rows mean the municipality does not publish that field for this record — not that the value is zero or unknown to the City.
Site locations
The City publishes 1 location on this file. A development site is frequently several titled parcels, and collapsing them to one address would lose the site.
| Address | Type | Coordinates |
|---|---|---|
| 4386 RIDEAU VALLEY | — | 45.22851, -75.69235 |
Established facts
3 facts derived from this record. Open any one to see the field, method, confidence and official record behind it.
| Fact | Value | Evidence | Confidence |
|---|---|---|---|
| Application type | Plan of Subdivision | A · official field | 100% |
| Application type (French) | Plan de lotissement | A · official field | 100% |
| Status (French) | Période de Commentaires en Cours | A · official field | 100% |
Application type: Plan of Subdivision
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- APPLICATION_TYPE_EN
- Value as published
- Plan of Subdivision
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Application type (French): Plan de lotissement
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- APPLICATION_TYPE_FR
- Value as published
- Plan de lotissement
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Status (French): Période de Commentaires en Cours
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- OBJECT_CURRENT_STATUS_FR
- Value as published
- Période de Commentaires en Cours
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Observed changes
- 2026-06-09 · observed 2026-09-02application discoveredD07-16-26-0012 appeared in src.ottawa.development-applications.
Two dates are kept apart deliberately: when the change happened according to the source, and when this platform observed it. Conflating them would misrepresent how current the data is.
Record history
First acquired 2026-09-02 and last confirmed still published on 2026-09-02. The municipality has not changed any tracked field on this file in that time — this platform compares content hashes on every poll, so an unchanged record produces no version and no event.
Questions about D07-16-26-0012
Answered from this filing's published fields. Every sentence describes the application, not a building.
- What is D07-16-26-0012?
- D07-16-26-0012 is a subdivision filed with the City of Ottawa at 4386 RIDEAU VALLEY. The City describes it as: "Plan of Subdivision". It is a municipal filing — a record of what was put to the City, not a record of what was built.
- Has D07-16-26-0012 been approved?
- The City of Ottawa publishes the status of D07-16-26-0012 as "Comment Period in Progress". The public comment period is open. This is the window in which a member of the public can respond. A filing's status describes the application, not construction: an approved application is not a building, and an issued permit is not proof that work began.
- When was D07-16-26-0012 applied for?
- D07-16-26-0012 carries an application date of 2026-06-09 on the City of Ottawa's published record. No decision date is published.
- What else has been filed at 4386 RIDEAU VALLEY?
- 4 municipal filings are recorded at 4386 RIDEAU VALLEY, including D07-16-26-0012. Multiple filings at one address are normal — a development permit and its building permits are separate applications — and do not indicate multiple buildings.
Attribution
Contains information licensed under the Open Government Licence – City of Ottawa. Read the licence
This platform is not affiliated with or endorsed by any municipality.
Official record
Open the municipality's dataset ↗
Development Applications publishes no permalink for an individual file, so this opens the dataset the record came from. Search it for D07-16-26-0012.
- Source
- Development Applications
- Licence
- Open Government Licence – City of Ottawa v2.0 (8 September 2016)
- Rights
- Licensed with conditions
- Documents
- Link and cite only
- Updated
- Not published by the City. Observed maximum APPLICATION_DATE of 2026-08-13 on 2026-08-30, so the layer is current to within about three weeks.
Supporting documents
None are hosted here, and this is a rights decision rather than a gap in the pipeline. Calgary’s open data publishes no document URLs at all; the drawings and studies live in the City’s own map viewer and are largely authored by the applicant, which places them outside the licence’s grant.
View at the City ↗Parties
No party is named on this record.
Project
Official Plan Amendment — 4386 RIDEAU VALLEY
4 municipal files are linked to this development.
Something wrong?
The municipality’s record is authoritative. If this page disagrees with it, or names someone it should not, tell us.
Report an error