Ottawa · other
D09-04-26-0005
Ontario Heritage Act
What this status means
Decision pending. Review is finished and a decision has not yet been recorded.
Ottawa publishes this as “Report Completed”, which it uses to mean: The staff report is finished and the matter is ready to be decided.
Record as published
| Field | Value as published |
|---|---|
| File number | D09-04-26-0005 |
| Application type | Ontario Heritage Act |
| Category | Ontario Heritage Act |
| Description | Ontario Heritage Act |
| Status | Report Completed |
| Applied | 2026-02-05 |
| Decision | not published |
| Decided by | not published |
| Decision date | not published |
| Issued / released | not published |
| Must commence by | not published |
| Cancelled / refused date | not published |
| Appeal number | not published |
| Appeal hearing | not published |
| Appeal decision | not published |
| Address | 237 CLEMOW |
| Community | not published |
| Ward | Ward 17 |
| Land use district | not published |
| District description | not published |
| Proposed district | not published |
| Cross-references | not published |
Blank rows mean the municipality does not publish that field for this record — not that the value is zero or unknown to the City.
Site locations
The City publishes 1 location on this file. A development site is frequently several titled parcels, and collapsing them to one address would lose the site.
| Address | Type | Coordinates |
|---|---|---|
| 237 CLEMOW | — | 45.40418, -75.69482 |
Established facts
3 facts derived from this record. Open any one to see the field, method, confidence and official record behind it.
| Fact | Value | Evidence | Confidence |
|---|---|---|---|
| Application type | Ontario Heritage Act | A · official field | 100% |
| Application type (French) | Loi sur le patrimoine de l'Ontario | A · official field | 100% |
| Status (French) | Rapport terminé | A · official field | 100% |
Application type: Ontario Heritage Act
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- APPLICATION_TYPE_EN
- Value as published
- Ontario Heritage Act
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Application type (French): Loi sur le patrimoine de l'Ontario
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- APPLICATION_TYPE_FR
- Value as published
- Loi sur le patrimoine de l'Ontario
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Status (French): Rapport terminé
- Evidence
- A · official field confidence 100%
- How established
- Published by the authority in a structured field
- Source
- Development Applications
- Source field
- OBJECT_CURRENT_STATUS_FR
- Value as published
- Rapport terminé
- Observed
- 2026-09-02
- Produced by
- connector@ottawa-da
- Rights
- Licensed with conditions
- Official record
- Open at the municipality
Record history
First acquired 2026-09-02 and last confirmed still published on 2026-09-02. The municipality has not changed any tracked field on this file in that time — this platform compares content hashes on every poll, so an unchanged record produces no version and no event.
Questions about D09-04-26-0005
Answered from this filing's published fields. Every sentence describes the application, not a building.
- What is D09-04-26-0005?
- D09-04-26-0005 is a other filed with the City of Ottawa at 237 CLEMOW. The City describes it as: "Ontario Heritage Act". It is a municipal filing — a record of what was put to the City, not a record of what was built.
- Has D09-04-26-0005 been approved?
- The City of Ottawa publishes the status of D09-04-26-0005 as "Report Completed". The staff report is finished and the matter is ready to be decided. A filing's status describes the application, not construction: an approved application is not a building, and an issued permit is not proof that work began.
- When was D09-04-26-0005 applied for?
- D09-04-26-0005 carries an application date of 2026-02-05 on the City of Ottawa's published record. No decision date is published.
Attribution
Contains information licensed under the Open Government Licence – City of Ottawa. Read the licence
This platform is not affiliated with or endorsed by any municipality.
Official record
Open the municipality's dataset ↗
Development Applications publishes no permalink for an individual file, so this opens the dataset the record came from. Search it for D09-04-26-0005.
- Source
- Development Applications
- Licence
- Open Government Licence – City of Ottawa v2.0 (8 September 2016)
- Rights
- Licensed with conditions
- Documents
- Link and cite only
- Updated
- Not published by the City. Observed maximum APPLICATION_DATE of 2026-08-13 on 2026-08-30, so the layer is current to within about three weeks.
Supporting documents
None are hosted here, and this is a rights decision rather than a gap in the pipeline. Calgary’s open data publishes no document URLs at all; the drawings and studies live in the City’s own map viewer and are largely authored by the applicant, which places them outside the licence’s grant.
View at the City ↗Parties
No party is named on this record.
Something wrong?
The municipality’s record is authoritative. If this page disagrees with it, or names someone it should not, tell us.
Report an error