An independent research product · not a municipal serviceData licensed from Canadian municipalities · source registry

Ottawa · other

D09-04-26-0041

Ontario Heritage Act

Under review. The municipality records this as Report in Progress.municipal status: “Report in Progress

What this status means

Under review. Being assessed by the authority or circulated for comment.

Ottawa publishes this as “Report in Progress”, which it uses to mean: Staff are writing the report that will carry a recommendation.

Record as published

Fields as published by the municipality
FieldValue as published
File numberD09-04-26-0041
Application typeOntario Heritage Act
CategoryOntario Heritage Act
DescriptionOntario Heritage Act
StatusReport in Progress
Applied2026-08-13
Decisionnot published
Decided bynot published
Decision datenot published
Issued / releasednot published
Must commence bynot published
Cancelled / refused datenot published
Appeal numbernot published
Appeal hearingnot published
Appeal decisionnot published
Address1495 HERON
Communitynot published
WardWard 18
Land use districtnot published
District descriptionnot published
Proposed districtnot published
Cross-referencesnot published

Blank rows mean the municipality does not publish that field for this record — not that the value is zero or unknown to the City.

Site locations

The City publishes 1 location on this file. A development site is frequently several titled parcels, and collapsing them to one address would lose the site.

Locations on this application
AddressTypeCoordinates
1495 HERON45.38116, -75.65348

Established facts

3 facts derived from this record. Open any one to see the field, method, confidence and official record behind it.

Facts with evidence class
FactValueEvidenceConfidence
Application typeOntario Heritage ActA · official field100%
Application type (French)Loi sur le patrimoine de l'OntarioA · official field100%
Status (French)Rapport en coursA · official field100%
Application type: Ontario Heritage Act
Evidence
A · official field confidence 100%
How established
Published by the authority in a structured field
Source
Development Applications
Source field
APPLICATION_TYPE_EN
Value as published
Ontario Heritage Act
Observed
2026-09-02
Produced by
connector@ottawa-da
Rights
Licensed with conditions
Official record
Open at the municipality
Application type (French): Loi sur le patrimoine de l'Ontario
Evidence
A · official field confidence 100%
How established
Published by the authority in a structured field
Source
Development Applications
Source field
APPLICATION_TYPE_FR
Value as published
Loi sur le patrimoine de l'Ontario
Observed
2026-09-02
Produced by
connector@ottawa-da
Rights
Licensed with conditions
Official record
Open at the municipality
Status (French): Rapport en cours
Evidence
A · official field confidence 100%
How established
Published by the authority in a structured field
Source
Development Applications
Source field
OBJECT_CURRENT_STATUS_FR
Value as published
Rapport en cours
Observed
2026-09-02
Produced by
connector@ottawa-da
Rights
Licensed with conditions
Official record
Open at the municipality

Record history

First acquired 2026-09-02 and last confirmed still published on 2026-09-02. The municipality has not changed any tracked field on this file in that time — this platform compares content hashes on every poll, so an unchanged record produces no version and no event.

Questions about D09-04-26-0041

Answered from this filing's published fields. Every sentence describes the application, not a building.

What is D09-04-26-0041?
D09-04-26-0041 is a other filed with the City of Ottawa at 1495 HERON. The City describes it as: "Ontario Heritage Act". It is a municipal filing — a record of what was put to the City, not a record of what was built.
Has D09-04-26-0041 been approved?
The City of Ottawa publishes the status of D09-04-26-0041 as "Report in Progress". Staff are writing the report that will carry a recommendation. A filing's status describes the application, not construction: an approved application is not a building, and an issued permit is not proof that work began.
When was D09-04-26-0041 applied for?
D09-04-26-0041 carries an application date of 2026-08-13 on the City of Ottawa's published record. No decision date is published.
What else has been filed at 1495 HERON?
4 municipal filings are recorded at 1495 HERON, including D09-04-26-0041. Multiple filings at one address are normal — a development permit and its building permits are separate applications — and do not indicate multiple buildings.

Attribution

Contains information licensed under the Open Government Licence – City of Ottawa. Read the licence

This platform is not affiliated with or endorsed by any municipality.

Official record

Open the municipality's dataset

Development Applications publishes no permalink for an individual file, so this opens the dataset the record came from. Search it for D09-04-26-0041.

Source
Development Applications
Licence
Open Government Licence – City of Ottawa v2.0 (8 September 2016)
Rights
Licensed with conditions
Documents
Link and cite only
Updated
Not published by the City. Observed maximum APPLICATION_DATE of 2026-08-13 on 2026-08-30, so the layer is current to within about three weeks.

Supporting documents

None are hosted here, and this is a rights decision rather than a gap in the pipeline. Calgary’s open data publishes no document URLs at all; the drawings and studies live in the City’s own map viewer and are largely authored by the applicant, which places them outside the licence’s grant.

View at the City ↗

Parties

No party is named on this record.

Project

Zoning By-Law Amendment — 1495 HERON

4 municipal files are linked to this development.

Something wrong?

The municipality’s record is authoritative. If this page disagrees with it, or names someone it should not, tell us.

Report an error